Vopak Terminal Westpoort is a Greenfield Oil terminal that will be operational in 2012. It will be constructed in two phases and will have a capacity of 1,2 Mm3 in 2012. The simulation model allowed Vopak to analyze different configurations of the terminal infrastructure. The simulation showed that a different infrastructure dedication could improve the terminal performance.
Find more reference projects in our News section.
Bình luận