Shtokman LNG, Russia

Updated: Jan 15


Development of a detailed model for the selected concept and the FEED phase, including reproduction of breakdown of LNG trains, pumps and loading arms, ship arrival law with random variability, meteorological thresholds different for any ship type and any berth. The impact on the key operational indicators of several parameters (modified with respect to the “Base Case”) has been studied, including:

  • fleet composition and arrival laws

  • management scenarios (weather forecast before berthing and starting operations or not)

  • tank size

  • bunkering and dry dock operations done within the terminal

Find more reference projects in our News section.

#shtokman #lng #oilampgas

HEADQUARTERS

Delftechpark 38, 2628XH Delft, The Netherlands

Email: info@systemsnavigator.com

Tel (NL): +31 (0)15 7501030

Subscribe to get our latest updates

Connect with us:
  • LinkedIn Social Icon
  • YouTube Social  Icon

Home         Terms of Use         Privacy Policy         © Copyright 2020 Systems Navigator