Iron Ore Export Terminal, Senegal

Updated: Jan 15


Simulation of the navigation, berthing and loading operations of Capesize bulk carriers, by analysing the impact of meteorological conditions for different maritime works concepts. Offshore terminal in Bargny with Capesize moored at buoys and loaded from barges through a FTU (Floating Transfer Unit). The assessment with the ARENA model of the main operational indicators, such as waiting time of ships, number of ships in the waiting queue and continuity of the loading operations, has allowed determining the Operational Costs OPEX for each of the scenarios.

Find more reference projects in our News section.

#port

HEADQUARTERS

Delftechpark 38, 2628XH Delft, The Netherlands

Email: info@systemsnavigator.com

Tel (NL): +31 (0)15 7501030

Subscribe to get our latest updates

Connect with us:
  • LinkedIn Social Icon
  • YouTube Social  Icon

Home         Terms of Use         Privacy Policy         © Copyright 2020 Systems Navigator