Technical and hydraulic studies with a view to defining the final corridor alignment for the future large-scale inland waterway link between the Seine basin and the Scheldt basin. Optimisation of the central canal and terminal points in relation to traffic prospects and a given fleet composition, canal section gauging and capacity calculation.
Find more reference projects in our News section.
Comentarios