Port of Shtokman, Russia

Updated: Jan 15


Comparison for an operational point of view (average and maximum waiting time of ships and production losses of LNG) of two alternatives, at North and at South of the Orlovka bay : the second including a breakwater protection, unlike the first, whose meteorological thresholds are therefore more severe. Concept selection, by combining CAPEX (greater for the Southern alternative) and OPEX (calculated with ARENA, and greater for the Northern alternative).

Find more reference projects in our News section.

#port

HEADQUARTERS

Delftechpark 38, 2628XH Delft, The Netherlands

Email: info@systemsnavigator.com

Tel (NL): +31 (0)15 7501030

Subscribe to get our latest updates

Connect with us:
  • LinkedIn Social Icon
  • YouTube Social  Icon

Home         Terms of Use         Privacy Policy         © Copyright 2020 Systems Navigator